Replacing a roof is one of the most significant home improvement projects you can undertake. While it's a challenging endeavor, understanding the process is crucial, whether you plan a DIY approach or want to oversee a professional installation. A proper roof replacement ensures the protection of your home for decades. Masterpiece Roofing provides a complete step-by-step guide to help you understand every phase, from preparation to the final inspection, ensuring a durable and watertight system.
Important Note: Roofing is physically demanding and one of the most dangerous DIY projects. Falls, injuries from tools, and heat exhaustion are serious risks. This guide is for informational purposes. If you lack experience, proper safety equipment, or comfort with heights, it is always recommended to hire a licensed and insured professional roofing contractor.
Thorough preparation is the key to a smooth and efficient roof replacement, minimizing disruption and protecting your property.
Material Delivery:
Coordinate with your supplier for material delivery. Materials are usually delivered directly to the roof (using a conveyor truck) or placed on the driveway.
Ensure there's a clear path and sufficient space for delivery.
Confirm all ordered materials (shingles, underlayment, drip edge, flashing, nails, etc.) have arrived and are in good condition.
Site Protection:
Ground Cover: Lay down heavy-duty tarps or plywood around the perimeter of your house, extending several feet out, especially directly below the eaves. This catches falling debris (shingles, nails) and protects landscaping, patios, and driveways.
Vehicles/Valuables: Move all vehicles, grills, patio furniture, and other valuable items away from the house perimeter to prevent damage from falling debris.
Windows/Skylights: Consider covering windows and skylights with plywood or plastic sheeting for added protection, especially from falling nails or tools.
Safety Zone: Designate a clear "no-go" zone around the house for children, pets, and unauthorized personnel.
Photography: Take detailed "before" photos of your existing roof from various angles. This serves as a record of its condition and can be useful for insurance or warranty purposes.
This is the removal phase, requiring careful execution to expose the roof's foundation.
Permit Display: If you obtained a permit (which is highly recommended, if not required, for tear-offs), ensure it's prominently displayed.
Start Tear-Off: Begin at the ridge of the roof and work downwards towards the eaves. Use a roofing shovel or pry bar to systematically remove old shingles, felt paper, and any existing flashing. Discard debris into a designated refuse container (e.g., a dumpster placed close to the work area).
Nail Removal: As you remove shingles, meticulously pull out all old nails and fasteners. Leaving old nails can puncture new underlayment or cause problems with new shingles.
Deck Inspection: Once the old roofing is removed, thoroughly inspect the roof decking (plywood or OSB).
Look for any signs of water damage, rot, soft spots, sagging, or significant bowing.
Check for loose or missing decking boards.
Replace any damaged sections of decking with new material of the same thickness. This is crucial for the structural integrity of your new roof and for proper nail holding.
Clean Deck: Sweep the entire roof deck clean of all debris, dust, and remaining nails.
These components are vital for water management and secondary protection.
Drip Edge:
Install drip edge along the eaves (bottom edge) first. It should go under the underlayment at the eaves to direct water off the roof and into the gutters.
Install drip edge along the rakes (side edges) over the underlayment to protect the fascia board.
Overlap pieces by at least a few inches and secure with roofing nails every 8-12 inches.
Underlayment (Roofing Felt or Synthetic):
Begin installing the underlayment at the eaves, directly over the drip edge.
Roll out horizontal strips, overlapping each subsequent course by at least 2-4 inches (check manufacturer instructions). Ensure smooth, wrinkle-free application.
Secure the underlayment with roofing cap nails or staples, spaced according to manufacturer guidelines.
Extend the underlayment to cover the entire roof deck, overlapping at ridges and hips. This provides an essential secondary waterproof barrier.
These specialized applications ensure critical areas are protected and the shingle course starts correctly.
Valley Waterproofing: Valleys (where two roof planes meet) are highly vulnerable to water penetration.
Install an ice and water shield membrane first, centered along the valley and extending several feet up each side. This self-adhering membrane provides superior protection.
Over the ice and water shield, install a valley metal (W-valley or similar) or an additional layer of underlayment, depending on the shingle manufacturer's specifications for open or closed valleys.
Starter Shingles:
Along the eaves, install a row of starter shingles. These are specialized shingles or cut-down regular shingles that provide a continuous adhesive strip at the rake and eave, preventing water from getting under the first course of regular shingles and helping to prevent wind uplift.
Ensure they are properly aligned and nailed according to the shingle manufacturer's instructions.
Flashing is crucial for sealing any interruptions in the roof plane.
Pipe Boots: Install pre-formed rubber or metal pipe boots around all plumbing vent pipes. The base of the boot should sit flat on the underlayment, and the new shingles are laid over its bottom half, with the top half shingled over.
Chimney Flashing: This is often the most complex flashing. It typically involves:
Base Flashing: L-shaped metal pieces installed at the base of the chimney on all sides, with the bottom flanges installed under the shingles on the low side and over the shingles on the high side and sides.
Step Flashing: Individual L-shaped metal pieces woven in with each course of shingles where the roof meets a vertical wall (like a chimney or dormer wall).
Counter-Flashing: Metal pieces embedded into the mortar joints of the chimney/wall and bent down to cover the top edge of the step and base flashing, creating a watertight seal. This is often sealed with caulk.
Cricket (for wide chimneys): For chimneys wider than 24-30 inches on the high side, a small framed "cricket" (a miniature saddle-shaped roof) is built behind it to divert water around the chimney, preventing ponding.
Wall Flashing (Step and Counter-Flashing): Where the roof meets any vertical wall, use step flashing woven into shingle courses, with counter-flashing over it for a watertight seal.
Skylight Flashing: Follow the skylight manufacturer's specific flashing kit instructions, which often involve multiple layers of metal and sealant.
This is where your roof starts to take shape and gain its final appearance.
Shingle Laying:
Begin laying shingles from the bottom (eaves) upwards, typically from one end of the roof.
Follow the manufacturer's instructions carefully for shingle exposure (how much of each shingle is exposed), nail placement, and staggering patterns to ensure a strong, watertight, and visually appealing roof. Incorrect nailing is a common cause of shingle failure.
Snap chalk lines to maintain straight courses, especially on long runs.
Cut shingles neatly to fit at valleys, hips, and rake edges.
Hip and Ridge Cap Shingles:
Once the main field of shingles is laid, install hip and ridge cap shingles. These are specially designed shingles (or cut from regular shingles) that bend over the peaks (ridges) and angled intersections (hips) of the roof.
They are installed from the bottom of the hip/ridge upwards, overlapping each piece to provide a continuous, protective cap. Secure them with nails on each side, ensuring the nail heads are covered by the overlapping cap shingle above.
Vent Installation: Install roof vents (ridge vents, static vents, or power vents) according to manufacturer instructions, integrating them seamlessly into the shingle courses.
The job isn't done until the site is clean and the roof is thoroughly checked.
Magnetic Sweep: After all roofing is installed, use a large magnetic sweep tool to go over the entire ground perimeter, driveways, and any nearby grassy areas repeatedly. This is crucial for picking up stray nails, which are a hazard to tires and feet.
Debris Removal: Collect all remaining shingle scraps, felt paper, empty wrappers, and other debris. Ensure the dumpster or disposal container is removed.
Gutter Cleaning: Clean out any debris that may have fallen into the gutters during the project.
Post-Work Inspection (Visual):
From the Ground: Step back and visually inspect the entire roof from various angles on the ground. Look for straight shingle lines, uniform color, proper shingle alignment, and a generally neat appearance.
From a Ladder (Safely): If comfortable, safely get on a ladder to inspect flashing details, ridge caps, and shingle integrity closer up.
Interior Check: Inspect your attic for any signs of leaks or light coming through, especially around penetrations.
Final Permit Inspection: If required, contact your local building department to schedule the final inspection to ensure your new roof meets all code requirements.
Roofing is inherently dangerous. Prioritizing safety is non-negotiable.
Safety Protocols:
Fall Protection: Use a proper fall arrest system (harness, lanyard, anchor point) when working on steep roofs.
Ladder Safety: Use a sturdy, properly secured ladder. Ensure it extends at least 3 feet above the eaves.
Footwear: Wear non-slip, closed-toe work boots.
Eye Protection: Always wear safety glasses to protect from flying debris.
Gloves: Protect your hands from rough materials and sharp edges.
No Solo Work: Never work on a roof alone. Have at least one other person present for safety.
Weather: Do not work on a wet, icy, or extremely windy roof. Avoid working in extreme heat.
Tool Safety: Understand how to safely operate all power tools.
When to Hire Professionals:
Steep Pitches: Any roof with a steep pitch (typically anything greater than 6:12) poses a significant fall risk and is best left to professionals.
Multi-Story Homes: Working on a higher roof increases the danger of falls.
Complex Rooflines: Homes with many valleys, hips, dormers, or chimneys require specialized flashing knowledge and can be very challenging for DIYers.
Time Constraints/Physical Limitations: If you don't have the time, physical stamina, or necessary strength for days of strenuous work, hiring professionals is a wiser choice.
Permit/Code Compliance: Professionals are well-versed in local building codes and handle all permit and inspection requirements, ensuring your roof is installed correctly and legally.
Warranty: Licensed contractors can offer workmanship warranties, in addition to the manufacturer's material warranty, providing added peace of mind.
While a DIY roof replacement is technically feasible, the substantial risks, specialized skills, and sheer labor involved often make hiring a licensed and insured professional roofing contractor the safest, most efficient, and ultimately, most cost-effective option for a long-lasting, worry-free roof.
Don't gamble with your home's most important protection. Masterpiece Roofing offers expert roof replacement services, performed by licensed and insured professionals. We ensure meticulous preparation, flawless installation, and adherence to all safety and building codes, providing you with a durable, beautiful roof and lasting peace of mind. Contact us today for a free consultation and let us build you a truly masterful roof!
Office: 1248 Highland St, Holliston, 01746 MA
(508) 882-6080
Email: office@buttonmasterpieceroof.com
Site: www.masterpieceroof.com
Assistance Hours
Mon – Fri 8:00am – 4:00pm